Comparative Study on Different Ammonia Removal Technologies for Electrolytic Manganese Residue

Authors

  • Xinghua PENG Hubei Institute of Metallurgical Geology / Mineral Materials and Applied Engineering Technology Research Center of Hubei Province / Yichang Key Laboratory of Comprehensive Utilization of Mineral Resources
  • Jing TAN Hubei Institute of Metallurgical Geology / Mineral Materials and Applied Engineering Technology Research Center of Hubei Province / Yichang Key Laboratory of Comprehensive Utilization of Mineral Resources https://orcid.org/0000-0001-5595-7932
  • Dahai YOU Hubei Institute of Metallurgical Geology / Mineral Materials and Applied Engineering Technology Research Center of Hubei Province / Yichang Key Laboratory of Comprehensive Utilization of Mineral Resources
  • Guodong LI Hubei Institute of Metallurgical Geology / Mineral Materials and Applied Engineering Technology Research Center of Hubei Province / Yichang Key Laboratory of Comprehensive Utilization of Mineral Resources
  • Jin ZHANG Hubei Institute of Metallurgical Geology / Mineral Materials and Applied Engineering Technology Research Center of Hubei Province / Yichang Key Laboratory of Comprehensive Utilization of Mineral Resources
  • Li ZHANG Hubei Institute of Metallurgical Geology / Mineral Materials and Applied Engineering Technology Research Center of Hubei Province / Yichang Key Laboratory of Comprehensive Utilization of Mineral Resources

DOI:

https://doi.org/10.5755/j02.ms.46039

Keywords:

electrolytic manganese residue, ammonia nitrogen, ammonia removal, wet-process, pyrometallurgical-process

Abstract

Wet process ammonia removal and pyrometallurgical ammonia removal are two mainstream technologies for ammonia nitrogen treatment of electrolytic manganese residue (EMR). However, systematic comparative studies based on identical raw material conditions are currently insufficient, which cannot provide adequate support for enterprises in process selection. Taking EMR generated by an enterprise in Yichang as the research material, experiments on wet process and pyrometallurgical ammonia removal were carried out. The ammonia nitrogen removal performances of the two processes were compared and analyzed, and a multi-dimensional comprehensive evaluation was conducted in combination with process characteristics, resource utilization potential, and disposal cost. The results show that under the optimized conditions of calcium carbide slag dosage of 10 %, stirring time of 30 min, stirring speed of 300 r/min, and liquid-solid ratio of 20, the nitrogen removal rate of the wet process reaches 86.35 %. For the pyrometallurgical process, the nitrogen removal rate is 93.53 % under the calcination condition of 500 ℃ for 90 min. The wet process suffers from the generation of high ammonia nitrogen waste liquid, large reagent consumption, and limited resource recovery pathways for the treated residue. By contrast, the pyrometallurgical process can recover NH₃ from flue gas to prepare ammonia water, and the calcined slag possesses broad prospects for resource utilization, whereas it has the drawback of high energy consumption. Overall, pyrometallurgical ammonia removal technology is more suitable for engineering scenarios with large-scale treatment capacity and high requirements for residue resource utilization. The wet process still has applicability for scenarios featuring small-scale treatment and limited investment. This study provides a multi-dimensional decision-making reference for the scientific selection of ammonia removal processes for EMR.

 